Upstream Waterway

WATERWAY SYSTEM

Hydroelectric power plants utilize the water energy drop on the upstream waterway.

The machine set consists of the asynchronous generator and the water pump working in the turbine mode. The aggregate is installed in parallel to the upstream waterway.

Simple technical solution enables (through the servomotors M2 and M3) the correct pressure regulation on the output of the upstream waterway and the generator´s power. On the bigger upstream waterway is possible to install more parallel working machine sets.

 

For the construction the entirely serial manufactured components are used. That way we minimize the initial, service costs and achieve rapid return rate of whole hydroelectric works.

Our company offers complete studies projects and realization.